CIDB Grade G4 Contractor • Civil Engineering & Building Rehabilitation
BINA Commercial & Industrial Building Refurbishment in Malaysia
Bina Commercial & Industrial Building Refurbishment in Malaysia is delivered directly by Bina Integrated Technology Sdn. Bhd., executing complete commercial building modernization, structural concrete remediation, high-pressure chemical injection waterproofing, and high-rise facade restoration across Malaysia. Backed by 34+ years of civil contractor governance, in-house chemical manufacturing, and comprehensive 10-year CIDB warranties.
Fully certified under statutory Malaysian building laws, civil engineering standards & quality governance
Core Engineering Competencies
Specialized Commercial Refurbishment Services
Engineered solutions executing structural concrete rehabilitation, basement injection grouting, roof membranes, and high-rise facade preservation across Malaysia.
Service 01 • Building Modernization
Commercial Building Refurbishment: Complete Modernization & MEP Retrofit
Bina Integrated Technology executes complete structural and architectural refurbishment for commercial office towers, industrial manufacturing plants, and retail centers. We integrate diamond wire controlled demolition, load-bearing transfer beam strengthening, mechanical electrical plumbing (MEP) retrofits, and high-performance exterior weather-shielding to extend commercial asset service life by over 25 years.
We remediate deep structural concrete spalling, carbonation attack, and rebar corrosion across industrial and commercial facilities. Using high-tensile unidirectional Carbon Fiber Reinforced Polymer (CFRP) composite wrapping (ACI 440.2R), non-shrink fluid micro-concreting, and sacrificial zinc galvanic anodes, we restore and upgrade structural load capacities without adding heavy dead weight.
Fully restored beam load-bearing capacity certified by Professional Engineer (PE), zero operational downtime for facility operations.
Service 03 • Chemical Grouting & Membranes
Building Waterproofing & Leakage Repair: High-Pressure PU Injection & Membranes
Our waterproofing division specializes in stopping active, pressurized subterranean water leaks without destructive structural excavation. Operating high-pressure electric piston pumps at 2,500 to 3,500 PSI, we inject closed-cell hydrophobic polyurethane resins deep into crack networks. For flat roofs and podium decks, we install seamless liquid-applied aliphatic polyurethane elastomeric membranes verified by mandatory 48-hour ASTM D5957 flood tests.
High-resolution thermal camera diagnostics and electrical impedance moisture scanning to trace hidden water ingress pathways without destructive hacking.
High-Pressure Hydrophobic PU Injection Grouting (2,500–3,500 PSI)
Precision drilling of mechanical packers at 45-degree angles to inject chemical polyurethane resin that expands up to 25x upon contacting moisture to seal deep fissures.
Negative-Side Crystalline Waterproofing for Retaining Walls & Lift Pits
Deeply penetrating chemical formulations that react with free lime and concrete moisture to grow insoluble needle-like crystals deep inside capillary pores.
Multi-Layer Elastomeric Roof Membrane & ASTM D5957 Flood Test Handover
Seamless liquid-applied aliphatic polyurethane waterproofing with crack-bridging capacity over 400%, verified by a mandatory 48-hour static water flood test.
Injection Pressure
Foam Expansion Ratio
Elongation at Break
Flood Test Protocol
2,500 to 3,500 PSI High Pressure
>= 20x Closed-Cell Micro-Foam
>= 450% Elastomeric (ASTM D412)
ASTM D5957 48-Hour Static Water Test
Completed Project Proof • Civic Administration
Municipal Administrative Complex & Public Civic Auditorium (4 Interconnected Wings & Subterranean Plant Rooms)
Total gouging out of aged, cracked sealant followed by closed-cell polyethylene backing rod installation and ASTM C920 Class 50 polyurethane elastomer sealing.
Remediating spalling balcony soffits and mechanically securing hollow mosaic tiles using stainless steel anchoring pins and structural polymer grout injection.
Anti-Carbonation Siloxane Primer & Breathable Weather-Shield Finish
Application of penetrating siloxane water-repellent primer followed by two coats of pure elastomeric acrylic coating offering >50m CO2 diffusion resistance.
CO2 Diffusion Resistance
Vapor Permeability (Sd)
Joint Sealant Movement
Safety Accreditation
R >= 50m (BS EN 1062-6)
Sd <= 0.5m Breathable Class I
ASTM C920 Class 50 (+-50% movement)
IRATA Certified Dual-Rope Access
Completed Project Proof • High-Rise Strata
High-Rise Residential Strata Development (Twin 28-Storey Towers, Urban Metropolitan Center)
Stunning modern architectural facade rejuvenation, 100% weather-tight window envelopes, increased building asset valuation.
Proven Civil Engineering Methodology
Our 5-Step Structural Refurbishment Protocol
Every refurbishment project follows a strict engineering lifecycle under CIDB Act 520 and ISO 9001:2015 standards to guarantee structural longevity and watertight integrity.
01
Forensic Defect Diagnostic & Dilapidation Survey
Non-destructive testing (UPV, infrared thermography, core sampling, carbonation testing) to map concrete and envelope degradation accurately.
02
PE Structural Calculations & Method Statement
Professional Engineer (PE) structural calculations, material submittals (BS EN 1504 / ASTM C920), and detailed JSA safety method statements.
03
Substrate Remediation & Rebar Passivation
Precision hydro-demolition, rebar de-rusting to SA 2.5, sacrificial zinc anode installation, and crack preparation without structural vibration.
Engineering design and field installation protocols for high-tensile carbon fiber reinforced polymer (CFRP) composites to upgrade structural load capacities.
Classification of active vs dormant concrete cracks, crack depth calculation using transit-time UPV methods, and structural epoxy injection pressure parameters.
Preventing the 'incipient anode' (halo effect) in concrete patch repairs using embedded zinc sacrificial anodes and amino-alcohol migrating corrosion inhibitors.
Central Engineering Operations Hub in Bandar Baru Bangi
Unlike brokers or general subcontracting agents, Bina Integrated Technology Sdn. Bhd. operates our central chemical engineering, equipment fleets, and quality control laboratories directly from Bandar Baru Bangi, Selangor.
In-house tensile pull-off bond strength testing (ASTM C1583) and ultrasonic flaw detectors
Fleets of 3,500 PSI high-pressure electric reciprocating polyurethane injection pumps
Request a Technical Site Inspection & Custom Refurbishment Proposal
Speak directly with our senior civil structural engineers regarding concrete repairs, high-pressure PU chemical injection, facade rejuvenation, or commercial refurbishment.
Pricing Transparency: Usually starts from RM25,000 depending on project (need custom quote to be fair based on site slab condition & scope).