Completed Building Refurbishment Projects in Malaysia
Forensic engineering diagnostics, detailed before-and-after structural comparisons, and technical specification schedules for completed commercial and industrial refurbishment works across Malaysia under CIDB Grade G4 supervision.
Commercial Office Tower & Corporate Headquarters
18 Storeys • Golden Triangle Commercial Precinct, Kuala Lumpur
Chronic multi-level water ingress across 3 subterranean parking levels, severe exterior facade staining, failing expansion joints, and outdated MEP risers causing severe tenant attrition.
Active hydrostatic pressure through construction kicker joints exceeding 1.2 bar; phenolphthalein tests revealed carbonation depth reaching 30mm on transfer beams; facade mastic sealants exhibited 100% adhesive failure.
Comprehensive structural rehabilitation: 2,800 PSI dual-component hydrophobic PU injection grouting, Class R4 polymer micro-concreting on transfer beams, 12,000 meters of ASTM C920 Class 50 polyurethane expansion joint replacement, and two coats of breathable anti-carbonation siloxane elastomeric coating.
Industrial Manufacturing Plant & Heavy Logistics Warehouse
85,000 sq ft Floor Plate • Shah Alam Heavy Industrial Corridor
Heavy dynamic forklift traffic and chemical exposure caused extensive concrete spalling, hollow acoustic delamination, and exposed corroding rebars along 14 primary load-bearing transfer beams.
Tensile reinforcement suffered up to 15% cross-sectional diameter loss; carbonation depth exceeded rebar cover depth; concrete compressive strength tested at 22 MPa against 35 MPa original specification.
Comprehensive re-engineering: concrete breakout to 25mm behind rebar, abrasive blasting to SA 2.5 cleanliness, sacrificial galvanic zinc anode tie-ins (ASTM G109), recasting with Class R4 non-shrink micro-concrete, and dual-layer high-tensile unidirectional CFRP wrapping (ACI 440.2R).
Municipal Administrative Complex & Public Civic Auditorium
4 Interconnected Wings & Subterranean Plant Rooms • Putrajaya
Severe rainwater leakage across 4,200 sqm flat reinforced concrete roof into public auditorium and main electrical switchrooms, accompanied by active elevator pit flooding.
Trapped water beneath failing torch-on bitumen membrane caused blister delamination; infrared thermography (FLIR) mapped water travel along structural cracks; lift pit suffered continuous water ingress at 12 L/hr under hydrostatic pressure.
Stripped aged bitumen felt; repaired birdbath depressions with polymer-modified screed (1:100 fall); applied seamless liquid elastomeric aliphatic polyurethane membrane reinforced with non-woven polyester fleece; injected lift pit kicker cold joints with hydrophobic PU resin under 3,500 PSI.
High-Rise Residential Strata Development
Twin 28-Storey Towers • Petaling Jaya Metropolitan Precinct
Widespread ceramic mosaic tile hollow delamination presenting severe drop hazard to ground pedestrians; heavy black biological mold colonization; leaking window frame perimeter sealants.
Acoustic tap testing and thermal drone photogrammetry identified 1,450 sqm of hollow tiles; window mastic sealants showed total silicone oil dry-out and embrittlement.
Deployed IRATA-certified industrial rope-access abseiling teams; mechanically anchored hollow tiles using Grade 316 stainless steel pins and structural epoxy injection; replaced window mastics with ASTM C920 Class 50 polyurethane sealant; applied biocide wash, siloxane primer, and 3-coat anti-carbonation silicone protective weather-shield.
Request a Technical Site Inspection & Custom Refurbishment Proposal
Speak directly with our senior civil structural engineers regarding concrete repairs, high-pressure PU chemical injection, facade rejuvenation, or commercial refurbishment.
For further project specifications or diagnostic inquiries, our engineering desk is on standby. Reach out directly via our official WhatsApp desk.