Verified Case Studies • Civil Engineering Handover

Completed Building Refurbishment Projects in Malaysia

Forensic engineering diagnostics, detailed before-and-after structural comparisons, and technical specification schedules for completed commercial and industrial refurbishment works across Malaysia under CIDB Grade G4 supervision.

Case Study 01 Commercial Building Refurbishment

Commercial Office Tower & Corporate Headquarters

18 Storeys • Golden Triangle Commercial Precinct, Kuala Lumpur

Before: Forensic Site Diagnostic Failure State
Before inspection photo for Commercial Office Tower & Corporate Headquarters
Site Challenge:

Chronic multi-level water ingress across 3 subterranean parking levels, severe exterior facade staining, failing expansion joints, and outdated MEP risers causing severe tenant attrition.

Diagnostic Forensic Findings:

Active hydrostatic pressure through construction kicker joints exceeding 1.2 bar; phenolphthalein tests revealed carbonation depth reaching 30mm on transfer beams; facade mastic sealants exhibited 100% adhesive failure.

After: Completed Handover CIDB G4 Certified
After refurbishment completed photo for Commercial Office Tower & Corporate Headquarters
Civil Engineering Remediation:

Comprehensive structural rehabilitation: 2,800 PSI dual-component hydrophobic PU injection grouting, Class R4 polymer micro-concreting on transfer beams, 12,000 meters of ASTM C920 Class 50 polyurethane expansion joint replacement, and two coats of breathable anti-carbonation siloxane elastomeric coating.

Technical Specification Schedule:
Subterranean Sealing 2,800 PSI Hydrophobic Polyurethane
Patch Mortar Class BS EN 1504 Class R4 (>45 MPa)
Joint Sealant Rating ASTM C920 Class 50 (+-50% movement)
Contractor Warranty 10-Year Watertight & Structural Warranty
Case Study 02 Concrete Repair & Structural Strengthening

Industrial Manufacturing Plant & Heavy Logistics Warehouse

85,000 sq ft Floor Plate • Shah Alam Heavy Industrial Corridor

Before: Forensic Site Diagnostic Failure State
Before inspection photo for Industrial Manufacturing Plant & Heavy Logistics Warehouse
Site Challenge:

Heavy dynamic forklift traffic and chemical exposure caused extensive concrete spalling, hollow acoustic delamination, and exposed corroding rebars along 14 primary load-bearing transfer beams.

Diagnostic Forensic Findings:

Tensile reinforcement suffered up to 15% cross-sectional diameter loss; carbonation depth exceeded rebar cover depth; concrete compressive strength tested at 22 MPa against 35 MPa original specification.

After: Completed Handover CIDB G4 Certified
After refurbishment completed photo for Industrial Manufacturing Plant & Heavy Logistics Warehouse
Civil Engineering Remediation:

Comprehensive re-engineering: concrete breakout to 25mm behind rebar, abrasive blasting to SA 2.5 cleanliness, sacrificial galvanic zinc anode tie-ins (ASTM G109), recasting with Class R4 non-shrink micro-concrete, and dual-layer high-tensile unidirectional CFRP wrapping (ACI 440.2R).

Technical Specification Schedule:
CFRP Tensile Strength >= 3,800 MPa (ASTM D3039)
Tensile Elastic Modulus >= 230 GPa High Modulus
Cathodic Protection Sacrificial Galvanic Zinc Anodes
Adhesion Bond Strength >= 2.0 MPa Substrate Failure (ASTM C1583)
Case Study 03 Building Waterproofing & Leakage Repair

Municipal Administrative Complex & Public Civic Auditorium

4 Interconnected Wings & Subterranean Plant Rooms • Putrajaya

Before: Forensic Site Diagnostic Failure State
Before inspection photo for Municipal Administrative Complex & Public Civic Auditorium
Site Challenge:

Severe rainwater leakage across 4,200 sqm flat reinforced concrete roof into public auditorium and main electrical switchrooms, accompanied by active elevator pit flooding.

Diagnostic Forensic Findings:

Trapped water beneath failing torch-on bitumen membrane caused blister delamination; infrared thermography (FLIR) mapped water travel along structural cracks; lift pit suffered continuous water ingress at 12 L/hr under hydrostatic pressure.

After: Completed Handover CIDB G4 Certified
After refurbishment completed photo for Municipal Administrative Complex & Public Civic Auditorium
Civil Engineering Remediation:

Stripped aged bitumen felt; repaired birdbath depressions with polymer-modified screed (1:100 fall); applied seamless liquid elastomeric aliphatic polyurethane membrane reinforced with non-woven polyester fleece; injected lift pit kicker cold joints with hydrophobic PU resin under 3,500 PSI.

Technical Specification Schedule:
Elastomeric Elongation >= 450% Crack-Bridging (ASTM D412)
Injection Pressure 3,500 PSI High-Pressure Packers
Testing Verification ASTM D5957 48-Hour Static Flood Test
UV Resistance Aliphatic Non-Yellowing Topcoat
Case Study 04 Facade Restoration & Exterior Painting

High-Rise Residential Strata Development

Twin 28-Storey Towers • Petaling Jaya Metropolitan Precinct

Before: Forensic Site Diagnostic Failure State
Before inspection photo for High-Rise Residential Strata Development
Site Challenge:

Widespread ceramic mosaic tile hollow delamination presenting severe drop hazard to ground pedestrians; heavy black biological mold colonization; leaking window frame perimeter sealants.

Diagnostic Forensic Findings:

Acoustic tap testing and thermal drone photogrammetry identified 1,450 sqm of hollow tiles; window mastic sealants showed total silicone oil dry-out and embrittlement.

After: Completed Handover CIDB G4 Certified
After refurbishment completed photo for High-Rise Residential Strata Development
Civil Engineering Remediation:

Deployed IRATA-certified industrial rope-access abseiling teams; mechanically anchored hollow tiles using Grade 316 stainless steel pins and structural epoxy injection; replaced window mastics with ASTM C920 Class 50 polyurethane sealant; applied biocide wash, siloxane primer, and 3-coat anti-carbonation silicone protective weather-shield.

Technical Specification Schedule:
Tile Pin Anchors Grade 316 Marine Stainless Steel
CO2 Diffusion Resistance R >= 50m (BS EN 1062-6)
Vapor Permeability Sd <= 0.5m Breathable Class I
Access Methodology 100% Certified IRATA Industrial Rope Access
CIDB Grade G4 Technical Advisory Desk

Request a Technical Site Inspection & Custom Refurbishment Proposal

Speak directly with our senior civil structural engineers regarding concrete repairs, high-pressure PU chemical injection, facade rejuvenation, or commercial refurbishment.

Pricing Transparency: Usually starts from RM25,000 depending on project (need custom quote to be fair based on site slab condition & scope).
Chat on WhatsApp (+60 13-340 7007)

For further project specifications or diagnostic inquiries, our engineering desk is on standby. Reach out directly via our official WhatsApp desk.